UALR - University of Arkansas, Little Rock, Arkansas

2008 Station Move and Upgrade

Before Trench
Site layout before installation Trench for power/signal conduit
Pouring Concrete Vault
Puring concrete for pier Connection to sensor container
Laying conduit View
Placing plastic pipe into trench View toward UA administration building
Trench refilled Building connection
Refilled trench Conduit connection to building after being painted
Vault with lid Sensor in vault
Vault with lid Sensor in vault before insulation applied
Vault with water
Vault with water

Photos courtesy Dr. Haydar Alshukri, Arkansas Earthquake Center

Last Changed May 30, 2012