Conduit trenching to seismic vault
Hole for seismic vault being prepared.
Signal conduit running from building to seismic vault; cable buried and trench filled.
Quanterra data recorder and power supply.
Guralp sensor installed in seismic vault with provisions for Episensor.
[BACK]