Prepared by David Crossley and Jacques Hinderer, November 1996. Recent Meetings(1) Bonn. There was a GGP report and discussion on Wednesday 18 September within the Working Group Meeting 'High Precision Tidal Data Processing', held at the Technical University of Bonn 16-19 September 1996. Those in attendance were: Casula, Crossley, Ducarme, Francis, Hinderer, Hsu, Jentzsch, Kääriäinen, Meurers, Neumeyer, Richter, Van Camp, Virtanen and Wenzel. (2) Tokyo. There was a GGP meeting on Wednesday 2 October at 12:00-14:00 in B1001 Sanjo Hall, University of Tokyo, within the International Symposium on Gravity, Geoid and Marine Geodesy in Tokyo, 30 September - 4 October, 1996. The GGP meeting was organized by Takemoto, Imanishi and Crossley. Those in attendance were: Crossley, Francis, Fukuda, Higashi, Hinderer, Hsu, Imanishi, Kaminuma, Makinen, Marson, Mukai, Nawa, Richter, Sato, Segawa, Shibuya, Takemoto, Tamura, Warburton and Wenzel. As a result of these two meetings, a number of proposals and recommendations were discussed. It was agreed that if no further communications or comments are received by either of the GGP officers (Crossley, Hinderer) before 15 December 1996, then the agreements and recommendations contained in this Newsletter would remain in effect until the Working Group Meeting on 21 July 1997 in Brussels (see below). Review of QuestionnaireThe Questionnaire circulated in the previous Newsletter attracted almost complete agreement between the groups on the proposed timetable for GGP and on the cooperation of the groups in providing data as stipulated. In answer to Question 1 (will you have one or more functioning SGs at the start of the Observing Period?), it appears clear that at least 15 instruments should be in operation on a quasi-permanent basis. Considering that the original GGP proposal hoped to be able to field a minimum of 6-8 instruments, the delay in implementation of the Observing Period has had the benefit of allowing an increased number of sites to be prepared. Acceptance of Time PeriodsAll groups accepted that from now until 1 July 1997 would constitute the Pilot Study period. This enables groups to perform a number of important tasks that are essential for the successful operation of the project: (a) installation and preparation of instruments, upgrades to equipment, modifications to the data acquisition systems (where appropriate). (b) performance of calibration procedures for the instruments and data acquisition systems. (c) practise in the exchange of data by electronic means and according to the agreed upon formats and conventions. All groups accepted that 1 July 1997 would be the start of the Observing Period . This will run for a minimum of 6 years until 30 June 2003. ICET as the GGP Data CentreAll groups accept ICET (International Centre for Earth Tides, Brussels) as the center for the archive, exchange and processing of GGP data. Through agreement with the Director (B. Ducarme) and Vice Director (O. Francis), ICET agrees to receive data according to the GGP standards. A letter (attached) to ICET further stipulates that ICET be consulted with respect to changes in GGP data and formats. Station ReviewA number of changes to the station configuration are indicated on the attached List of GGP Stations. Most important are the following: (a) Strasbourg has acquired a new compact dewar. The current list of stations is shown below: Table 1. SG Station Locations
Test FormatThe primary data to be exchanged is 1 minute gravity and pressure data in PRETERNA format. The file naming format currently proposed is given in Table 2. All SG groups should examine this format immediately to see if it meets their needs, and if not, to suggest improvements to Crossley and/or Hinderer. Filename ConventionThe following is an example of how to construct the filename for gravity and pressure data for the month of December, 1989 from the station in Cantley, Canada. The raw data at 1s sampling data are decimated to 1 min: Table 2. GGP Filenames
1. The latest version of the ZIP (formerly PKZIP) program should be used. Older versions cannot handle the newer zipped file formats. 2. If the auxiliary and log files are not available, the zip file will contain only the gravity and pressure data file. 3. SG Groups should experiment with the construction and sending of files according to the GGP Agreements. Data Repair CodesTable 3. GGP Data Repair Codes (a) repair done on raw data, before decimation to 1 min
(b) repair done on data after decimation to 1 min
(c) One hour data, decimated from 1 min
Notes: 1. Gaps and disturbances are defined as loss of data, spikes, earthquakes, helium refills, calibrations and other interruptions to the data stream. 2. SG groups should send 00 files, as defined in Table 3, to ICET. The raw data provides useful information on the site conditions and state of health of the instrument and data acquisition system. 3. Additionally, all groups are strongly encouraged to send repaired data (either 02 or 12 files) processed according to local data repair experience and practise. Example 1 min FileEach one month file should be in the form of a header, followed by time stamped data for each minute. Figure 1 shows the file structure that corresponds to the filename in Table 2. The header information in this file shows the minimum information necessary to process the data. Headers may be longer. This ASCII (.ggp) file takes 1.66 MB of disk space and 0.44 MB when compressed with ZIP.EXE. Filename : ca891200.ggp Station : Cantley, Canada Instrument : TT70 GWR 012 N Latitude : 45.5850 E Longitude : 284.1929 Height m : 269 Gravity : -63.94 microgal / V Pressure : 60.82105 millibar / V Author : Crossley (crossley@eas.slu.edu) yyyymmdd hhmmss gravity(V) pressure(V) C******************************************** 77777777 000000 0.0 0.0 19891201 000000 2.711686 2.984059 19891201 000100 2.680915 2.984405 19891201 000200 2.578493 2.984734 19891201 000300 2.730598 2.985076 19891201 000400 3.296396 2.985428 ... 19891231 235500 2.814888 2.723250 19891231 235600 2.795676 2.722451 19891231 235700 2.790064 2.721816 19891231 235800 2.791065 2.721525 19891231 235900 2.790888 2.721012 99999999 Figure 1. Example 1 min Data File Earthquake DataSG groups have indicated willingness to make available raw data 1-2 weeks following selected large teleseismic events (moment magnitudes of order 7.5 or greater). A broadcast Email message to all groups will be sent by Hinderer (Strasbourg) indicating events whose data should be prepared for sending to ICET. Earthquake Data FormatA suggestion for the file name convention is given in Table 4. Table 4. Earthquake Data Filename
Example Earthquake Data FileAn example file is given in Figure 2. This is 10 days of 10s gravity data following the magnitude 7.7 event under Hokkaido, Japan, beginning 12 July 1993. Note that to conserve disk space, each sample is not time stamped, rather the (UT) time of the initial sample is given, the number of samples and sampling interval. Missing values should be designated by 99.0. The end of file is designated by 99999999, as for the 1m files. This file take 1.02 MB in ASCII format and 0.36 MB when compressed using ZIP.EXE. NB: Because ZIP files loose their DOS filename extensions, 1 min and earthquake data might be confused (or overwritten) in their zipped form if stored in the same directory. Filename : ca930712.10g Station : Cantley, Canada Instrument : TT70 GWR 012 N Latitude : 45.5850 E Longitude : 284.1929 Height m : 269 Gravity : -63.94 microgal / V yyyymmdd : 19930712 hhmmss : 000000 No. samples : 86400 Sampling : 10.0sec Data format : (6f12.7) Author : Crossley (crossley@eas.slu.edu) C************************************************************* -0.5061047 -0.5031543 -0.5026706 -0.5043538 -0.5067025 -0.5064495 -0.5051077 -0.5067879 -0.5092642 -0.5094902 -0.5084866 -0.5074243 -0.5077556 -0.5106755 -0.5126884 -0.5121571 -0.5118811 -0.5125290 -0.5137124 -0.5142505 -0.5136628 -0.5140121 -0.5152020 -0.5157181 -0.5168655 -0.5182320 -0.5179317 -0.5183780 -0.5193126 -0.5182234 ... -1.1738826 -1.1783767 -1.1807186 -1.1800373 -1.1815287 -1.1822327 -1.1822515 -1.1831082 -1.1846977 -1.1876949 -1.1874323 -1.1868742 -1.1903643 -1.1911156 -1.1906251 -1.1938142 -1.1950426 -1.1941563 -1.1957331 -1.1975970 -1.2003344 -1.2015472 -1.2005579 -1.2032920 -1.2045080 -1.2044385 -1.2066984 -1.2068674 -1.2073495 -1.2099165 99999999 Figure 2. Example Earthquake Data File Recommended Earthquakes for Data ExchangeThe following list of earthquakes should be used to select events that can be exchanged during the Pilot Study periods. The columns are date, time, latitude, longitude, depth and magnitude (l for local, s for surface wave). Courtesy of the IRIS WWW Site. 1990/06/20 21:00:09.9 36.957N 49.409E 19.0 7.7Ms MHDF WESTERN IRAN 1990/07/16 07:26:34.6 15.679N 121.172E 25.0 7.8Ms MHDF LUZON, PHILIPPINE ISLANDS 1993/07/12 13:17:11.9 42.851N 139.197E 17.0 7.7Ml MHDF HOKKAIDO, JAPAN REGION 1993/08/08 08:34:24.9 12.982N 144.801E 59.0 8.0Ms MHDF SOUTH OF MARIANA ISLANDS 1994/06/02 18:17:34.0 10.477S 112.835E 18.0 7.8Ml MHDF SOUTH OF JAWA, INDONESIA 1994/06/09 00:33:16.2 13.841S 67.553W 631.0 8.2Ml MHDF NORTHERN BOLIVIA 1994/10/04 13:22:55.8 43.773N 147.321E 14.0 8.3Ml MHDF KURIL ISLANDS 1994/12/28 12:19:23.0 40.525N 143.419E 27.0 7.8Ml MHDF EAST COAST OF HONSHU, JP 1995/04/07 22:06:56.8 15.199S 173.529W 21.0 8.0Ms MHDF TONGA ISLANDS 1995/05/16 20:12:44.2 23.008S 169.900E 20.0 7.7Ms MHDF LOYALTY ISLANDS REGION 1995/08/16 10:27:28.6 5.799S 154.178E 30.0 7.8Ms MHDF SOLOMON ISLANDS 1995/12/03 18:01:08.9 44.663N 149.300E 33.0 7.9Ms MHDF KURIL ISLANDS 1996/01/01 08:05:11.9 0.724N 119.981E 33.0 7.8Ml WHDF MINAHASSA PENINSULA, SULAW 1996/02/17 05:59:29.7 0.950S 137.027E 33.0 8.1Ms WHDF IRIAN JAYA REGION, INDON 1996/06/17 11:22:18.5 7.137S 122.589E 587.0 7.8Ml WHDF FLORES SEA SG CalibrationMethodsThere are several methods to calibrate a superconducting gravimeter: - the inertial method based on the generation of artificial accelerations from an oscillating platform; this technique was developed for SG calibration by IFAG (Richter 1995; Richter et al., 1995) and was shown to be able to provide calibration accuracy better than 0.1% ; - the gravitational method based on the Newtonian attraction of a known distribution of masses (e.g. ring torus); this method was developed by the Physics Department of the University of Bologna and the precision is close to 0.3% (Achilli et al., 1995); - the comparison with absolute gravity measurements made in parallel at the same site for a period of some days; different SG groups are using this technique and the accuracy ranges from values slightly better than 1% for the older JILAG type instruments (Hinderer et al. 1991; Hinderer et al. 1995) to 0.1% for the new FG-5 instruments (Francis 1996). In addition there are calibration methods using parallel registration with other 'calibrated' relative spring meters, vertical or horizontal gravity gradients (calibration lines) or electrostatic or electromagnetic forces (this last one is merely for the check of the stability in time of the calibration factor). It is strongly recommended that every SG station which will take part of the GGP does a calibration experiment before the official starting time of July 1, 1997 using one of the 3 previous techniques and, in any case, leading to a calibration accuracy at least better than 1% which is needed in any attempt of geophysical interpretation of tidal results in terms of mantle inelasticity (e.g. Dehant & Zschau 1989), ocean loading (e.g. Francis & Melchior 1996, Llubes & Mazzega 1996) or other phenomena (Rydelek et al. 1991; Melchior 1995). Instrument Phase LagThe phase lag of the recording system of the SG (gravimeter sensor + feedback + analogue anti-aliasing filter) should be verified experimentally. Again, every group should check the phase lag of its system before July 1, 1997 and it is suggested to use the so-called 'step response method' (Richter & Wenzel 1991; Wenzel 1995) which consists in applying through a parallel adder a specific step as in put and to measure the response of the system as output function. The Fourier transform of this response function leads then to the frequency-dependent transfer function as well as to the phase lag of the system. The accuracy resulting from the phase lag determination with the help of this method is smaller than 10-4 degree for the semi-diurnal wave M2 . This is much smaller than what is needed to study phase lags due to anelasticity in the mantle (e.g. Dehant & Zschau 1989). Loading ParametersOcean LoadingICET has agreed to provide ocean loading parameters for all the stations of the GGP network. This will be done for a selection of the most recent and widely available ocean loading models and for the major tidal waves only. The parameters will not be time dependent, but new sets of parameters will be calculated as new ocean tide models are introduced by the community. More accurate regional ocean load models will be necessary for some GGP stations and these should be computed by the appropriate groups and individuals. Atmospheric LoadingThere is no provision at present for global atmospheric pressure data through ICET or any other data center. In future it may be possible to provide global pressure data for the GGP Observing Period. This possibility is being considered at Saint Louis University which already has direct access to global surface pressure data though NCAR. In order to provide a standard processing of the 1 minute data, ICET will use the ETERNA tidal processing package with a single scalar admittance between the atmospheric pressure and gravity at the observing station. GWR Anti-Aliasing FilterAgreement was reached on the form of the anti-aliasing filter for high rate sampling. GWR Instruments has agreed to provide a replacement tide filter board containing the following items: (1) A modified tide output filter, according to agreed-upon specifications (see below). (2) An adder input for injecting a step response for calibration checks (see Calibration). (3) Passive components with reduced temperature sensitivity, especially important for installations where the electronics units are not in thermally controlled environments. It is highly recommended that SG groups consider the benefit of this upgrade before the start of GGP. The cost is projected to be under $2K US. Filter DesignThe analog filter should incorporate the following design elements: (1) For a sampling interval of either 1s or 2s, the Nyquist frequency should be 0.25Hz. (2) Simple (i.e. as few elements) as possible, to avoid an unpleasant impulse response. (3) Flat ( ± 1%) from 0 frequency to a minimum of 0.02Hz (50s period). If possible this should be extended to higher frequencies such as 0.04Hz (25s period). (4) Amplitude roll-off of 100 dB between the corner frequency and the Nyquist frequency. (5) Phase Shift < 0.05 deg / cpd. Linear with frequency f. GWR is currently designing a compromise filter, possibly a 4-pole or 6-pole standard Butterworth design. WorkshopsIt is considered essential that GGP participants meet on a yearly basis to discuss the technical aspects of the instrumentation, data acquisition and methods of interpretation for all aspects of high precision gravimetry. The format for these Workshops should be detailed technical exchanges, conducted informally, perhaps stimulated by a small number of seed presentations to initiate discussion. A GGP Workshop is not intended to duplicate the format of a conference or even an IAG Working Group Meeting. Therefore Workshops should be held in conjunction with major international conferences at which GGP members could submit a formal presentation and receive travel assistance. The First GGP Workshop is Scheduled for Monday, 21 July 1997 in Brussels, just prior to the International Symposium on Earth Tides. Details of this Workshop will be discussed with ICET and information will be distributed early in the new year by the GGP Secretariat. At each Workshop the location of the next Workshop, the following year, will be agreed upon. Future International Conferences that might be suitable are: 1998 either Tours (SEDI) or Trieste (IGC); 1999 Birmingham (IUGG); 2000 ?; 2001 ? (Earth Tides Symposium); 2002 ?; 2003 ? (IUGG). WWW Home PagesAn administrative Home Page for GGP has been started at Saint Louis University (http://www.eas.slu.edu/). It will be updated to include a Bulletin Board and to set up links to ICET and to other Home Pages. Each SG group is encouraged to set up its own Home Page, describing the site, instrument and other pertinent information. As part of the GGP Home Page, a list of GGP publications has been initiated. SG Groups are asked to check these and to contribute publications that may have been omitted. PublicityWe agree there should be an article on GGP for one of the June issues of EOS, just prior to the start of the Observing Period. At the same time a Special Issue of BIM will commemorate the launch of GGP. Relations with IAGThere has been some dialogue between GGP and representative of IAG concerning future relations both with IAG and with the new Working Group on Intercomparison between SG and Absolute Gravimeters (G-Gramophone). Inasmuch as GGP began life as part of SEDI, an inter-union project of IUGG, GGP does not formally belong to any one section of IUGG. Nonetheless, the connections with IAG tend to dominate GGP due to the inclusion of the tidal community within GGP. The goals of GGP and G-Gramophone are mutually supportive, since GGP embraces all time scales of relative gravity, including long term variations where absolute gravity measurements are essential as an intercomparison. Further, absolute gravimeters are widely used as a calibration device for SGs, so that absolute gravimetry is integral to GGP. For the moment, GGP members are content with the status quo, i.e. no formal ties to IAG, though GGP is grateful to IAG for supporting the goals of the project. It remains to be seen if this situation continues or whether there may emerge some benefits for GGP to establish closer links to IAG, e.g. as a Special Interest Group. Mailing ListA master email address ggpmail@eas.slu.edu has been created for GGP including all those on the Mailing List with email addresses. All members of the list may send mail to the list. |