Site of installation, college grounds.
Digging trench to run cable from Industrial Technology building to accelerometer.
Preparing site for vault burial.
Installing accelerometer in the rain.
Vault with accelerometer.
Insulated foam plug installed. Vault and GPS antenna shown.
Installation done, capping vault.
Finished site.
Before - school's wiring closet.
After - power supply and serial server.
Site repairs, February 2003.